2014, DONG Energy, West of Duddon Sands, FLiDAR Wind Data
Summary
Data & downloads
Datasets
Related Pages
Series2018, EGS, West of Duddon Sands, Post Construction Surveys 2018, Survey B - West of Duddon
Ørsted Power contracted EGS international Ltd (EGSi) to undertake a bathymetric survey at West of Duddon Sands (WDS01) Offshore Windfarm in the Irish Sea. Data was acquired during September to November 2018. The purpose was to fulfil the asset integrity reporting requirements namely bathymetric understanding and 2017 vs 2018 bathymetric comparisons of change at the site of the offshore substation, the subsea route that follows the two export cables, all turbines and IACs. The surveys were conducted onboard the EGS owned coastal survey vessel ‘EGS Watchful’, which operated on a 12hr basis from Fleetwood Marina and Orsteds operational docking facility at Barrow-in-Furness. Vessel mobilisation, calibrations and verifications began between 4th and 14th April 2018 whilst the vessel was in Ramsgate and were then completed offshore Barrow after the vessel was road transported to site. Survey operations commenced at WDS01 on 30th September 2018 and concluded on 22nd November 2018.
Series2017, Bibby HydroMap, West of Duddon Sands, Survey 1- Crossing and Proximity Agreement Survey (CPA)
Bibby HydroMap were commissioned in April 2017 by DONG Energy to carry out surveys for the crossing and proximity agreement on the WoDS export cables. The surveys were completed under Bibby HydroMap’s Terms and Conditions. The surveys were carried out between 26/04/17 and 04/05/17. The main objectives were as follows: - Minimum 100% coverage - Sounding density better than 40 hits/m2 - Freespan detection >0.2m - Detect any debris of size larger than 0.5m in any dimension (width, length or height) on the seabed Data acquisition was undertaken from Bibby HydroMap’s own vessel MV Lia.
Series2016, Deep BV, West of Duddon Sands, Bathymetric Survey (Crossing and Proximity Agreement)
Deep BV has been contracted by Dong Energy Ltd. to conduct several bathymetrical surveys at the West of Duddon Sands Windfarm (WDS01) in the East Irish Sea, United Kingdom. The surveys were performed as one combined survey operation, during autumn 2016 and can be divided in two parts: Survey 1 – This consent survey covered a selection of 6 wind turbine generators (WTGs), 17km of array cables between the WTGs, the WDS01 substation, as well as the entire route of export cable north and the export cable south. The objective of the survey was to accurately measure the current state of the offshore installations, to identify areas with seabed change and scour development around structures and to identify potential cable exposures and/or free-spans of cables. Survey 2 – The Crossing and Proximity Agreement (CPA) survey. This survey covered two cable crossing agreements (A10 & A11) and the proximity agreements (A12). This series covers Survey 2 (Crossing and Proximity Agreement (CPA) survey) only.The primary objectives of the autumn 2016 post-construction survey to be undertaken within the scope of this specification include as a minimum (as defined by Dong): Accurately map the seabed in the defined survey areas; Identify areas with seabed change and scour development around structures, down to 10 cm changes, compared to previous surveys; Document all observed cable crossings and rock dumps in the survey areas. Show examples from "typical areas", representing the majority of the site/cable routes; Identify potential cable exposures/free-spans of cables and describe changes (and potential exposures/free-spans) in detail; Document accuracy of measurements; Create a 3D model of exposed/free-spanning cables from MBES data; Align all data processing, interpretation and reporting with respect to the technical specifications in Dong Appendix 7 (WDS01 - 2016 - Post-construction Survey - Appendix 7 - Technical Requirements).
Series2016, Deep BV, West of Duddon Sands, Post-construction Bathymetric Survey (Survey 1 Consent)
Deep BV has been contracted by Dong Energy Ltd. to conduct several bathymetrical surveys at the West of Duddon Sands Windfarm (WDS01) in the East Irish Sea, United Kingdom. The surveys were performed as one combined survey operation, during autumn 2016 and can be divided in two parts: Survey 1 – This consent survey covered a selection of 6 wind turbine generators (WTGs), 17km of array cables between the WTGs, the WDS01 substation, as well as the entire route of export cable north and the export cable south. The objective of the survey was to accurately measure the current state of the offshore installations, to identify areas with seabed change and scour development around structures and to identify potential cable exposures and/or free-spans of cables. Survey 2 – The Crossing and Proximity Agreement (CPA) survey. This survey covered two cable crossing agreements (A10 & A11) and the proximity agreements (A12). This series covers Survey 1 (Consent survey) only.The primary objectives of the autumn 2016 post-construction survey to be undertaken within the scope of this specification include as a minimum (as defined by Dong): Accurately map the seabed in the defined survey areas; Identify areas with seabed change and scour development around structures, down to 10 cm changes, compared to previous surveys; Document all observed cable crossings and rock dumps in the survey areas. Show examples from "typical areas", representing the majority of the site/cable routes; Identify potential cable exposures/free-spans of cables and describe changes (and potential exposures/free-spans) in detail; Document accuracy of measurements; Create a 3D model of exposed/free-spanning cables from MBES data; Align all data processing, interpretation and reporting with respect to the technical specifications in Dong Appendix 7 (WDS01 - 2016 - Post-construction Survey - Appendix 7 - Technical Requirements).
Series2015, Fugro EMU Limited, West of Duddon Sands, Bathymetric Survey
A geophysical survey of the West of Duddon Sands (WDS01) and Barrow Offshore (BOW01) windfarm arrays and export cables for DONG Energy was carried out by Fugro. Two Fugro vessels were utilised; Fugro Seeker and Valkyrie.
2015, CMACS, West of Duddon Sands, Year 1 Ornithological Survey
This report presents results of the surveys in and around West of Duddon Sands in 2015, which represent the first post-construction survey year, following pre-construction (baseline) surveys carried out in 2012 and during-construction surveys in 2013 and 2014. Some comments on the results are provided, although the focus of the report is on presentation of the survey data.
2014, WWT Consulting, West of Duddon Sands, Weekly peak counts of Pink-footed Geese and Whooper Swans
Each week during the surveillance period, morning counts of Pink-footed Geese and Whooper Swans roosting on the WWT Martin Mere reserve were made from hides. Counts were conducted around first light, before the birds left the reserve to feed. A summary of weather conditions during the week and any notes regarding count data were also made.
Series2014-2016, DONG Energy, West of Duddon Sands, Met Mast Wind Data
This series contains the data from the West of Duddon Sands Offshore Wind Farm meteorological mast.
Series2014, Boskalis Offshore, West of Duddon Sands, Provision of Rock Installation Services
DONG Energy West of Duddon Sands (UK) Ltd., and ScottishPower Renewables (WoDS) Ltd. awarded the Rock Installation contract for West of Duddon Sands – cable crossings Project to Boskalis Offshore. The report in this series, Project Installation Procedures (PIP), has been prepared to provide information regarding the following aspects of the project: • Scope of work; • Working methods; • Materials to be used; • Quality control procedures; • Planning; • Deliverables At four crossing locations the exposed cable will be covered with rock. A filter layer has been installed prior to the final armour layer. A separation layer has been installed prior to the cable lay.
Series2013-2014, CT Offshore, West of Duddon Sands, Southern and Northern Export Cable MBES SSS and TSS ROV Survey
The export of power from the WODS offshore wind farm is transferred through 2 designated main export power cables connecting the wind farm with onshore installations. The scope of work carried out by CT Offshore has been to complete a MBES, SSS and a TSS rov survey of both cables, from here and onwards designated as the northern and southern WODS export cable. The task and objective of the MBES and SSS is to identify and report abnormalities such as exposed cables and interfering object along and in relation to the cable position and map the seabed bathymetry as well.
Series2013-2015, CT Offshore, West of Duddon Sands, Cable Install and Burial Surveys
Array cable as build survey - MBES
Series2013-2014, GoBe, West of Duddon Sands, Environmental Monitoring Report
This report provides a summary of the monitoring completed at WDS during the construction period, with such monitoring undertaken during the period April 2013 to September 2014. Accordingly the report is termed the Construction Monitoring Report. Those parameters that required construction monitoring (under the Marine Licence) included marine mammals, archaeology and ornithology.