Summary
Bibby HydroMap were commissioned in July 2016 by DONG Energy to carry out at a survey after a rock dumping campaign at West of Duddon Sands Windfarm (WDS01), and an Asset Integrity Management (AIM) survey Burbo Bank Windfarm (BBW01). In addition to this, a variation order (VO 01) was commissioned for a cable repair survey at WDS01 and a debris surv...