2008 - 2009, RSK Environment Ltd, Westermost Rough, Onshore Cable Route and Substation Environmental Impact Assessment

2008 - 2009, RSK Environment Ltd, Westermost Rough, Onshore Cable Route and Substation Environmental Impact Assessment

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

June 2023

Collection date:

January 2008 - August 2009

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This project is an Environmental Impact Assessment for a proposed onshore cable and substation associated with Westermost Rough Offshore Wind Farm. The project was undertaken by RSK Group PLC in 2009 and has been compiled by means of a desk-based study including a review of readily available information supplemented by data received from both statu...

Categories:
Environmental Statements
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
1

Data Highlights


Explore the wealth of the data gathered in the 2008 - 2009, RSK Environment Ltd, Westermost Rough, Onshore Cable Route and Substation Environmental Impact Assessment


6

Westermost Rough Offshore Wind Farm: Onshore Cable Route and Substation Environmental Impact Assessment