2008-2009, EMU Ltd., Westermost Rough Offshore Wind Farm, Hydrographic Survey

2008-2009, EMU Ltd., Westermost Rough Offshore Wind Farm, Hydrographic Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

October 2008 - February 2009

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This project was conducted by Emu Ltd at the site of the proposed Westermost Rough offshore wind farm and cable corridor. The scope of the survey specified the collection of simultaneous multibeam bathymetry and sidescan sonar along survey lines to ensure full coverage of the wind farm site and a 600m wide corridor on the proposed northern cable ro...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
9
Reports
1