Summary
This project was conducted by Emu Ltd at the site of the proposed Westermost Rough offshore wind farm and cable corridor. The scope of the survey specified the collection of simultaneous multibeam bathymetry and sidescan sonar along survey lines to ensure full coverage of the wind farm site and a 600m wide corridor on the proposed northern cable ro...