2008, QinetiQ, Westermost Rough Offshore Wind Farm, Radar Pre-planning Assessment

2008, QinetiQ, Westermost Rough Offshore Wind Farm, Radar Pre-planning Assessment

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

December 2008 - December 2008

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This project is a pre-planning assessment of the potential impact of Westermost Rough offshore wind farm on radar in the vicinity of the proposed development. QinetiQ undertook the project in 2008 assuming the worst case, as agreed with Dong Energy, using the maximum number of turbines and the largest blade tip height. The assessment takes into con...

Categories:
Shipping and Navigation
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1