2012-2013, MMT, Westermost Rough, Geophysical Survey and Anomaly Inspection(0)

2012-2013, MMT, Westermost Rough, Geophysical Survey and Anomaly Inspection(0)

Summary

MMT was contracted by DONG to perform a geophysical survey and anomaly inspection in the planned offshore wind farm Westermost Rough outside the Yorkshire coast, England. The survey area is located about 8 km off the Yorkshire coast, north of Hull, England and is divided in two sections; Export Cables and Inter Array area. The purpose of the survey was to inspect anomalies/objects and to investigate the two proposed Export cables and the Inter Array cables inside the wind farm. The survey comprised a geophysical section with acquisition of MBES; SSS and SBP data and ROV visual inspections.
Categories
Geophysical
Development
Westermost Rough
Industry
Wind
Phase
Pre-construction
Organisation
MMT
Available in this series
8 Datasets, 6 Reports