2015, Spectrum Geosurvey, Westermost Rough Offshore Wind Farm, Consent Survey Q2 2015

2015, Spectrum Geosurvey, Westermost Rough Offshore Wind Farm, Consent Survey Q2 2015

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

June 2015 - June 2015

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Spectrum Geosurvey Limited was contracted to perform sidescan sonar and multibeam bathymetry surveys on the Westermost Rough offshore wind farm (WMR01). The purpose of the survey programme was to serve as the first of six consent surveys in the operation and maintenance phase of the wind farm’s FEPA licence agreement.

The survey scope consisted of...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
3
Reports
2