Summary
Forewind has installed 2 meteorological masts within the Dogger Bank Offshore Wind Farm Round 3 Development Zone. Dogger Bank East (DBE) was installed during March 2013 and Dogger Bank West (DBW) was installed during September 2013. Both met masts were deployed by Fred Olsen United. The suction bucket foundation and lattice towers were put in pla...