2016, EGS, Zone 6 - Rampion, Geotechnical Survey

2016, EGS, Zone 6 - Rampion, Geotechnical Survey

Summary

The Rampion Offshore Windfarm (ROWF) requires pre-construction geotechnical survey work to be undertaken within the offshore site, and along the Export Cable (EC) route. The aim of the shallow geotechnical investigation is to provide additional information at specific areas in order to enable final route engineering and to investigate proposed construction jack-up vessel positions on selected turbine locations and at the OSS.
Categories
Geotechnical
Development
Zone 6 - Rampion
Industry
Wind
Phase
Pre-construction
Organisation
EGS
Available in this series
1 Dataset, 1 Report

Data & downloads

Datasets