2011, RSK Environment, Zone 6 - Rampion, Cable Landfall and Intertidal Ecology Survey

2011, RSK Environment, Zone 6 - Rampion, Cable Landfall and Intertidal Ecology Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

June 2026

Collection date:

May 2011 - May 2011

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

RSK have been contracted by E.ON to produce an Environmental Statement for the proposed
Rampion Offshore Windfarm in the English Channel, offshore of Brighton. It is currently proposed
that the electricity export cable will make landfall in the intertidal area between East Worthing and
South Lancing.
An ecological survey was conducted on the 18-19t...

Categories:
Benthic Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Datasets
1
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Intertidal Sampling Locations

Select a Package from the list on the left to see more information about it