2011, RSK Environment, Zone 6 - Rampion, Cable Landfall and Intertidal Ecology Survey

2011, RSK Environment, Zone 6 - Rampion, Cable Landfall and Intertidal Ecology Survey

Summary

RSK have been contracted by E.ON to produce an Environmental Statement for the proposed Rampion Offshore Windfarm in the English Channel, offshore of Brighton. It is currently proposed that the electricity export cable will make landfall in the intertidal area between East Worthing and South Lancing. An ecological survey was conducted on the 18-19th May 2011 to provide baseline environmental information on the intertidal landfall area for the export cable of the proposed Rampion Offshore Windfarm. The survey comprised a walkover survey of habitats and features of interest present, and sampling of sediment for laboratory analysis of benthic communities, particle size, and chemical contamination. Sampling was conducted on the low water of a Spring tide.
Categories
Benthic Ecology
Development
Zone 6 - Rampion
Industry
Wind
Phase
Pre-Consent
Organisation
RSK Environment
Available in this series
1 Dataset, 1 Report

Data & downloads

Datasets

Data Highlights