2012, RPS, Zone  8 - Bristol Channel Atlantic Array, Ports Assessment

2012, RPS, Zone 8 - Bristol Channel Atlantic Array, Ports Assessment

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

July 2010 - January 2011

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

As part of the third round of offshore wind farm leasing managed by The Crown Estate, RWE Npower Renewables Ltd (NRL) were awarded the rights by The Crown Estate in December 2009 to develop a 1,500 MW offshore wind farm in the Bristol Channel to be constructed between 2015 and 2018.  The project is known as the Atlantic Array.  NRL requires port fa...

Categories:
Shipping and Navigation
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'