2013-2014, Subacoustech, Zone 9 - Celtic Array, Noise Assessment

2013-2014, Subacoustech, Zone 9 - Celtic Array, Noise Assessment

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

September 2013 - November 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Subacoustech Environmental Ltd carried out a detailed noise assessment for the proposed Rhiannon Wind Farm (RWF) on behalf of Centrica. This assessment forms  chapter 9 and 11 of the Stage 2 Preliminary Environmental Information (Stage 2 PEI) of the Rhiannon Offshore Wind Farm, which is part of the Environmental Impact Assessment (EIA). 

Analysis ...

Categories:
Noise
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
2
Reports
1