2014, Regeneris Consulting, Zone 9 - Celtic Array, Offshore Socio Economic Study

2014, Regeneris Consulting, Zone 9 - Celtic Array, Offshore Socio Economic Study

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

January 2014 - February 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This study forms  chapter 19 of the Stage 2 Preliminary Environmental Information (Stage 2 PEI) of the Rhiannon Offshore Wind Farm, which is part of the Environmental Impact Assessment (EIA). The study was carried out by Regeneris and it describes the existing environment with regard to socio-economics and assesses the potential impacts of the Offs...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
1