Summary
This project details the collection and analysis of soil and water samples at the site of the Barrow offshore wind farm. Envirolab carried out the analysis of the samples. For methodology details, see the BOW Construction Monitoring Report.
This project details the collection and analysis of soil and water samples at the site of the Barrow offshore wind farm. Envirolab carried out the analysis of the samples. For methodology details, see the BOW Construction Monitoring Report.