Summary
The work includes a seabed and a sub-seabed survey of the construction area and the export cable corridor, contracted to Fugro EMU and surveyed May to October 2013. The main aims with the survey were to: - Map and quantify the possibility for unexploded ordnance (UXO) within the turbine construction area and the export cable corridor - Acquire and ...

