Summary
DOW is located 32 km off the North Norfolk coast, in water depths of between 18 m and 25 m. The site will have a capacity of 402 MW (Mega Watts) and comprise of 67 wind turbine generators. The export cables will be approximately 38 km long, with the cable landfall at Weybourne Hope. As part of the Environmental Statement (ES) required for the appli...