2014, Fugro EMU, Dudgeon, Baseline Ecology Study

2014, Fugro EMU, Dudgeon, Baseline Ecology Study

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

August 2014 - September 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

DOW is located 32 km off the North Norfolk coast, in water depths of between 18 m and 25 m. The
site will have a capacity of 402 MW (Mega Watts) and comprise of 67 wind turbine generators. The
export cables will be approximately 38 km long, with the cable landfall at Weybourne Hope.
As part of the Environmental Statement (ES) required for the appli...

Categories:
Benthic Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
1

Data Highlights


Explore the wealth of the data gathered in the 2014, Fugro EMU, Dudgeon, Baseline Ecology Study


5

Dudgeon Offshore Wind Farm: Pre-construction Baseline Ecology