2018, Ocean Ecology, Race Bank, Post-Construction year 1 Benthic Report

2018, Ocean Ecology, Race Bank, Post-Construction year 1 Benthic Report

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

February 2026

Collection date:

July 2018 - July 2018

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

January 2026

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Completed in late 2017, Race Bank Offshore Wind Farm (ROW01) (The Project) is comprised of 91 x 6.3 Mega-Watt (MW) Wind Turbine Generators (WTGs), built on 7 m diameter monopile foundations. The project supports two Offshore Sub Stations (OSSs), inter-array cables (IACs) and two subsea export cables with an export cable link between the two offshor...

Categories:
Benthic Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
1