Summary
This report summarises the findings of the winter 2011 / 12 during construction aerial surveys of the London Array Ltd. Offshore Wind Farm (OWF) site, and associated control Zones, for birds and marine mammals. Construction of the Phase 1 area of the London Array Ltd. OWF commenced in March 2011 and is due to be completed by the end of 2012. The ...