2022, The Crown Estate, Offshore Wind Evidence and Change Programme (OWEC), Priorities for Investment 2022 Onwards

2022, The Crown Estate, Offshore Wind Evidence and Change Programme (OWEC), Priorities for Investment 2022 Onwards

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

September 2023

Collection date:

July 2022 - July 2023

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

January 2023

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This series contains a document which is a refresh of the Priorities for Investment document issued in 2022. Apart from the addition of a new priority on “Whole of Seabed”, only de minimis changes have been made to the previous version. 

It is issued to the OWEC Programme Steering Group to inform the next Project Call, expected to open in Septemb...

Categories:
Benthic Ecology
Birds
Epifauna and Fish
Marine Mammals
Other
Shipping and Navigation
Research
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series: