2024, The Crown Estate,  Habitats Regulations Assessment (HRA), Round 5 Floating Offshore Wind

2024, The Crown Estate, Habitats Regulations Assessment (HRA), Round 5 Floating Offshore Wind

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

February 2024

Collection date:

December 2021 - February 2024

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

February 2024

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The Floating Offshore Wind Round 5 Plan-level HRA was undertaken by The Crown Estate to assess the potential implications of the 2024 Floating Offshore Wind Round 5 Plan on European sites, as required under the Habitats Regulations.  
 
The following documents have been produced by NIRAS Group (UK) Ltd and are provided within this Series: Principle...

Categories:
Other
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
4