2005-2006, BOWind, Barrow Offshore Wind Farm, Construction Monitoring

2005-2006, BOWind, Barrow Offshore Wind Farm, Construction Monitoring

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

June 2026

Collection date:

March 2005 - June 2006

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Barrow Offshore Wind Farm is located in the East Irish Sea near Barrow in-Furness. The transmission cable runs into Morecambe Bay where it is connected to the National Grid transformer station in Heysham. The construction of Barrow Offshore Wind Farm took place between March 2005 and July 2006. The wind farm is now operational and generating power....

Categories:
Birds
Marine Mammals
Noise
Onshore
Sedimentology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
4

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Ocean Marine Ltd. Boat-based Bird Survey Data

Select a Package from the list on the left to see more information about it