2010-2012, Fugro, Greater Gabbard, Interconnector and Inter Array Cable Depth of Burial Survey

2010-2012, Fugro, Greater Gabbard, Interconnector and Inter Array Cable Depth of Burial Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

May 2010 - August 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

 Greater Gabbard Offshore Winds Ltd have recently completed the construction of a wind farm approximately
14mi east of Suffolk coast.
The offshore wind farm consists of 152 Wind Turbine Generators (WTGs) with a gross nameplate capacity of
approximately 504MW. The project is now fully operational and the construction was completed in September
2012....

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
1