Summary
Brown and May Marine Ltd. was commissioned by DONG Energy to undertake post construction fisheries surveys within the Gunfleet Sands Offshore Wind Farm development. The post construction surveys used the same vessel and gear specifications and survey methodology as the pre-construction surveys, undertaken in 2007