2004, ABPmer, Gunfleet Sands 1 and 2, Inter-turbine Cable Installation Options

2004, ABPmer, Gunfleet Sands 1 and 2, Inter-turbine Cable Installation Options

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

October 2004 - October 2004

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This project addresses an issue in the present FEPA license pertaining to cable installation methods between the turbines for the Gunfleet Sands Offshore Wind Farm.  A review of potential inter-turbine cable installation methods for Gunfleet Sands Offshore Wind Farm has been undertaken.  The review identifies the two primary installation options as...

Categories:
Sedimentology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1