2005, Osiris Projects, Gunfleet Sands 1 and 2, Main Cable Route Geophysical Survey

2005, Osiris Projects, Gunfleet Sands 1 and 2, Main Cable Route Geophysical Survey

Summary

On the instructions of RPS Energy, acting on behalf of GE Gunfleet Limited, Osiris Projects were commissioned to carry out marine geophysical surveys over two adjacent proposed offshore wind farm sites and their associated cable routes, at Gunfleet Sands in the outer Thames estuary. Data acquisition took place during the period 27th September 2005 to 21st December 2005, with survey works undertaken using Osiris Projects survey catamaran MV ‘LIA’.
Categories
Geophysical
Development
Gunfleet Sands 1 and 2
Industry
Wind
Phase
Pre-construction
Organisation
Osiris Projects
Available in this series
1 Dataset, 1 Report

Data & downloads

Datasets