Summary
The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake Multibeam Echosounder (MBES) and Side Scan Sonar (SSS) surveys at the Gunfleet Sands Offshore Windfarm in the Thames Estuary. The scope of work included: 1. MBES and SSS survey of 100m wide corridor along Export Cable Route between the windfarm sub...