The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake a survey of the installed HDD exit point, including the as-laid protective mattresses, at the Gunfleet Sands 3 Windfarm in the Thames Estuary. The scope of work, for the April 2013 survey was for a MBES survey of an area of the seabed centred on the location of HDD exit point and installed protective mattresses. This series covers survey elements which were undertaken on the 26th April 2013.
Categories
Geophysical
Development
Gunfleet Sands 3
Industry
Wind
Phase
Post-construction
Organisation
PLA Hydrographic Service
Available in this series
4 Datasets, 1 Report

Data & downloads

Datasets