2013, PLA Hydrographic Service, Gunfleet Sands 3, Export Cable and WTG Inspection Surveys (Autumn)
Summary
Data & downloads
Datasets
Related Pages
Series2016, PLA Hydrographic Service, Gunfleet Sands 3, Bathymetric Survey
The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake a Multibeam Echosounder (MBES) survey at the Gunfleet Sands 3 Offshore Windfarm in the Thames Estuary. The scope and technical specifications for the survey work, was outlined in Documents nos 2575696 (Appendix 6) and 2575636 (Appendix 7) respectively and included: 1. MBES survey of 50m wide corridor along Export Cable Route between the WTG F00 and the HDD exit point [See Figure 1]. 2. MBES survey of the WTG foundations F00 and G00 (100m x 100m) and 50m wide corridor along the inter-array cable. The report in this series covers survey elements which were undertaken on 12th, 13th and 14th December 2016. The bathymetric data along the export cable has been compared to the previous PLA data from May 2016 and the pre-works survey of 2012.
Series2015, PLA Hydrographic Service, Gunfleet Sands 3, Export Cable and WTG Inspection Surveys (Summer)
The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake a Multibeam Echosounder (MBES) survey at the Gunfleet Sands 3 Offshore Windfarm in the Thames Estuary. The scope of work, for the June 2015 survey included: 1. MBES survey of 50m wide corridor along Export Cable Route between the WTG F0 and the HDD exit point [See Figure 1]. 2. MBES survey of the WTG foundations F00 and G00 and inter-array cable. This series covers survey elements which were undertaken on the 20th & 21st June 2015, along the Export Cable Route and around Turbines F00 and G00. The survey work was carried out using the PLA survey vessel ‘Yantlet’, with bathymetric data being collected using a hull-mounted Reson SeaBat 8125h MBES.
Series2014, PLA Hydrographic Service, Gunfleet Sands 3, Export Cable and WTG Inspection Surveys (Autumn)
The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake a Multibeam Echosounder (MBES) survey at the Gunfleet Sands 3 Offshore Windfarm in the Thames Estuary. The scope of work, for the September 2014 survey included: 1. MBES survey of 50m wide corridor along Export Cable Route between the WTG F0 and the HDD exit point. 2. MBES survey of the WTG foundations F00 and G00 and inter-array cable. This report covers survey elements which were undertaken on the 5th & 6th September 2014, along the Export Cable Route and around Turbines F00 and G00. The survey work was carried out using the PLA survey vessel ‘Yantlet’, with bathymetric data being collected using a hull-mounted Reson SeaBat 8125h MBES.
Series2014, Subacoustech Environmental, Gunfleet Sands 3, Monitoring and Assessment of Operational Subsea Noise
Subacoustech Environmental Ltd has undertaken measurements of underwater noise at Gunfleet Sands 3 Demonstrator Wind Farm whilst the turbines were operational. Background noise measurements were undertaken in March 2013 prior to the operational phase of the wind farm. On 29th and 30th July 2014, underwater noise measurements were taken along transects extending away from the operational turbines. The measured data have been analysed and presented herein and shows that there has been negligible increase in the sound pressure levels compared to the levels measured prior to the turbines being made operational.
Series2014, PLA Hydrographic Service, Gunfleet Sands 3, Export Cable and WTG Inspection Surveys (Spring)
The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake a Multibeam Echosounder (MBES) survey at the Gunfleet Sands 3 Offshore Windfarm in the Thames Estuary. The scope of work, for the April/May 2014 survey included: 1. MBES survey of 50m wide corridor along Export Cable Route between the WTG F0 and the HDD exit point. 2. MBES survey of the WTG foundations F00 and G)) and inter-array cable. This series covers survey elements which were undertaken on the 10th April and 16th May 2014, along the Export Cable Route and around Turbines F00 and G00. The survey work was carried out using the PLA survey vessel ‘Yantlet’, with bathymetric data being collected using a hull-mounted Reson SeaBat 8125h MBES.
Series2013 - 2014, GoBe Consultants, Gunfleet Sands 3, Environmental Monitoring Report (Year 1)
This monitoring summary report has been prepared by DONG Energy as part of the Marine Licence monitoring program for the Gunfleet Sands 3 Demonstration Project, under Marine Licence L/2012/00100/7. This report describes the environmental monitoring completed during the first year post construction period running from July 2013 – July 2014, in line with the requirements of the Gunfleet Sands 3 Demonstration Project Marine Licence.
2013, Natural Power Consultants, Gunfleet Sands 3, Export Cable Monitoring (Year 1)
The report shows the post construction monitoring of benthic communities around the Gunfleet Sands Demonstration Project (GFS3) export cable. The aim of the monitoring programme was to identify any change in benthic infaunal and epifaunal assemblages relating to the installation and operation of the GFS3 export cable, in order to validate the predictions made in the Environmental Statement (ES), and the associated addendum.
Series2013, PLA Hydrographic Service, Gunfleet Sands 3, HDD Exit Point - Inspection Survey
The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake a survey of the installed HDD exit point, including the as-laid protective mattresses, at the Gunfleet Sands 3 Windfarm in the Thames Estuary. The scope of work, for the April 2013 survey was for a MBES survey of an area of the seabed centred on the location of HDD exit point and installed protective mattresses. This series covers survey elements which were undertaken on the 26th April 2013.
Series2013, PLA Hydrographic Service, Gunfleet Sands 3, Scour Protection – Inspection Survey
The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake a survey of scour protection and the surrounding bed at the WTG locations at Gunfleet Sands in the Thames Estuary. The scope of work, for the April 2013 survey was for a MBES survey of an area the seabed, a minimum of 100m from the outer extent of the rock protection around the locations of installed bases of WTG F00 and G00. This series covers survey elements which were undertaken on the 25th & 26th April 2013.
Series2013, Subacoustech Environmental, Gunfleet Sands 3, Underwater Noise Survey
This report presents the results of underwater noise measurements from a survey undertaken to in and around Gunfleet Sands Phase 3 Offshore Wind Farm. The Gunfleet Sands site is situated approximately 7 km off the Essex coast near Clacton-on-Sea. Measurements were taken in order to provide an indication of the noise levels prior to the wind turbines being made operational. The data has been analysed to obtain noise levels in terms of unweighted levels and the dBht(Species) metric in order to provide an indication of existing levels of noise perceived by various species of animals in the water.
Series2012, N-Sea Survey BV, Gunfleet Sands 3, Geotechnical Site Investigation
The objective of the Geotechnical Investigations 2012 is to provide soil parameters for design and installation of the export cable route. The scope of work consists of 15 Vibrocores (6m), positions 113-115, 201-207 and 301-305. Purpose of the samples is to provide information for archaeological and export cable engineering purposes. N-SEA SURVEY B.V. has asked Marine Sampling Holland B.V. (MSH) to perform vibrocoring and laboratory works for the geotechnical investigation.
Series2012, EGS, Gunfleet Sands 3, UXO Clearance Survey
DONG Energy Renewables requested the PLA to provide geophysical and hydrographic survey works along 9km of the Phase 3 Gunfleet Sands Demo Offshore windfarm Site (OWF) proposed cable export route and proposed turbine sites for UXO clearance purposes. The PLA conducted the hydrographic (Multi Beam Echo Sounder (MBES)) element of the survey over the Gunfleet Sands site (Survey area delineated by the shape file Geophysical_Survey_Area_Planned_201203012.shp provided by DONG energy) on the 26th and 27th of March 2012. The equipment spread included a Reson 8125H MBES with Post-processed Kinematic (PPK) positioning via Applanix POS-MV GPS-aided inertial navigation system. In April 2012 EGS (International) Ltd was commissioned to provide support to the project undertaking the geophysical element of the survey with the objective to identify any Unexploded Ordnance (UXO) threat or other seabed obstruction that may pose a hazard to the export cables, array cables and WTG foundation.