2004, Osiris Projects, Gwynt y Mor, Phase 3 Geophysical Surveys

2004, Osiris Projects, Gwynt y Mor, Phase 3 Geophysical Surveys

Summary

Osiris Projects gathered bathymetry, sub-bottom data, and seabed features, including any magnetic anomolies and sonar contacts across the proposed Gwynt y Môr site during the period between 16th June 2004 and 10th August 2004 with approximately 50% of survey time lost due to adverse conditions.. These surveys were conducted using a side scan sonar with bathymetry collected in both analogue and digital forms.
Categories
Geophysical
Development
Gwynt y Mor
Industry
Wind
Phase
Pre-Consent
Organisation
Osiris Projects
Available in this series
11 Datasets, 2 Reports

Data & downloads

Datasets