
2004, Osiris Projects, Gwynt y Mor, Phase 3 Geophysical Surveys
Summary
Osiris Projects gathered bathymetry, sub-bottom data, and seabed features, including any magnetic anomolies and sonar contacts across the proposed Gwynt y Môr site during the period between 16th June 2004 and 10th August 2004 with approximately 50% of survey time lost due to adverse conditions.. These surveys were conducted using a side scan sonar with bathymetry collected in both analogue and digital forms.
Data & downloads
Datasets
