2002-2005, Hoare Lea, Gwynt y Mor, Noise Assessment

2002-2005, Hoare Lea, Gwynt y Mor, Noise Assessment

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

November 2024

Collection date:

June 2002 - November 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

November 2024

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This survey investigates the noise impact of the operation and construction phases of Gwynt y Mor Offshore Wind Farm. This desk-based project evaluates current background noise, calculates the likely impact of the project and looks at mitigation. It also considers the cumulative effect of Gwynt y Mor with the 3 current or proposed Wind Farms in the...

Categories:
Noise
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
4
Reports
1