2005, Seacore, Gwynt y Mor Offshore Wind Farm, Preliminary Geotechnical Site Investigation

2005, Seacore, Gwynt y Mor Offshore Wind Farm, Preliminary Geotechnical Site Investigation

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

October 2022

Collection date:

March 2005 - March 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

October 2022

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Seacore were commissioned by npower renewables Ltd to undertake preliminary geotechnical site investigation work at the Gwynt y Môr offshore wind farm site.

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'