2016, Fugro, Hornsea Project One - Heron Wind and Njord Ventus, UXO Survey

2016, Fugro, Hornsea Project One - Heron Wind and Njord Ventus, UXO Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

October 2021

Collection date:

June 2016 - November 2016

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Fugro was contracted by DONG Energy Wind Power A/S (hereafter known as the client) to undertake a preconstruction
and unexploded ordnance (UXO) survey on the Hornsea Project One offshore wind farm (HOW01).
The HOW01 site is located approximately 105 km east of Spurn Head and the Humber Estuary, in the western
North Sea, United Kingdom.
The survey c...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
14
Reports
3