Summary
Bibby HydroMap Ltd. were commissioned by DONG Energy in May 2016 to undertake a UXO surve y for the Hornsea Project One (HOW01) pre‐construction and UXO survey. The purpose of the survey is to provide information to mitigate the risk of unexploded ordnance (UXO) and information to optimise design and installation methods before construction. The ...