2018, EDF Renewables, Blyth Demonstration Site, Bird and Marine Mammal Monitoring Array 2 (Year 1)
Summary
Data & downloads
Datasets
Data Highlights
Related Pages
Series2020, Ultrabeam Hydrographic, Blyth Demonstration Site, Subsea Monitoring Survey
Ultrabeam Hydrographic were asked by EDF Energy Renewables to undertake a subsea monitoring survey of the Blyth Offshore Demonstrator - Array 2. The main objectives of the survey were to: - Identify seabed debris within the construction area; - Identify changes to seabed morphology to enable the evaluation of the effectiveness of installed scour protection and ratify the predictions for the scour development; - Inform the foundation and cable maintenance schedule; - Satisfy the requirements of the Marine Licence. The operations were undertaken between 24th June 2020 and 4th July 2020.
Series2020-2021, Natural Power Consultants, Blyth Demonstration Site, Fish and Shellfish Survey
The purpose of the surveys was to provide data on the fish and shellfish populations which is comparable to that collected during the EIA baseline (hereon referred to as EIA) in 2010/2011 and the pre-construction survey in 2016 respectively, along with the first two years of post-construction monitoring (2018 & 2019), in order to enable the detection of changes in the fish and shellfish communities of the area. The report in this series has been produced in order to provide BODL with the findings of year three otter trawl and potting surveys, which were undertaken by Natural Power Consultants Ltd, in line with the licence conditions and subsequent variations and agreements with the MMO.
Series2020-2021, EDF Renewables, Blyth Demonstration Site, Bird and Marine Mammal Monitoring Survey Array 2 (Year 3)
Year 3 Birds & Marine Mammal Post-Construction surveys and assessment for the operational Blyth Offshore Demonstrator Array 2 wind farm. The 2020-21 bird and marine mammal boat surveys covered the inner turbine array (described as ‘Array 2’in the project ES) plus a 3km buffer, with a 1km transect separation (as agreed with NE and the MMO). The survey area and survey transects are shown in Figure 1. Alternate transects follow the same route as those used in the EIA baseline (when a 2km separation was adopted), within the inner array 3km buffer zone, with an additional transect inserted between each. The total transect length is 53km, running approximately east-west.
Series2019, Bibby HydroMap, Blyth Demonstration Site, Operations and Maintenance Geophysical Surveys
Bibby HydroMap were commissioned by Blyth Offshore Demonstrator Ltd/EDF Renewables, in August 2018, to undertake a series of geophysical surveys at the Blyth Offshore Demonstrator wind farm, located off the north-east coast of the UK at Blyth, Northumberland. Surveys have been previously undertaken in August/September 2018, April 2019, and this, the most recent survey, was undertaken between the 29th October and 20th November 2019. Due to the general lack of seabed mobility, the survey boundary for this monitoring visit has been reduced to decrease survey acquisition and processing timescales for the client. The new boundaries were submitted to and approved by the Marine Management Organisation (MMO) in October 2019. This survey, comprising the collection of multibeam bathymetry and side scan sonar data, marks the third of a 3-year monitoring program, which will be undertaken at 6 monthly intervals, and after any major storm events. The objectives of the survey program were to acquire survey data to a resolution that will: - Identify seabed debris within the construction area; - Identify changes to seabed morphology to enable the evaluation of the effectiveness of installed scour protection and ratify predictions for scour development; - Inform the foundation and cable maintenance schedule; - Satisfy the requirements of the Marine Licence.
Series2019, Bibby HydroMap, Blyth Demonstration Site, Operations and Maintenance Geophysical Surveys
Bibby HydroMap were commissioned by Blyth Offshore Demonstrator Ltd/EDF Renewables, in August 2018, to undertake two geophysical surveys (in August-September 2018 and April 2019) at the Blyth Offshore Demonstrator wind farm, located off the north-east coast of the UK at Blyth, Northumberland. The 2019 survey was undertaken between 16th and 30th April 2019. This survey, comprising the collection of multibeam bathymetry and side scan sonar data, marks the first of a 3-year monitoring program, which will be undertaken at 6 monthly intervals, and after any major storm events. The objectives of the survey program are to acquire survey data to a resolution that will: - Identify seabed debris within the construction area; - Identify changes to seabed morphology, to enable the evaluation of the effectiveness of installed scour protection and ratify predictions for scour development; - Inform the foundation and cable maintenance schedule; and - Satisfy the requirements of the Marine Licence.
Series2018, Bibby HydroMap, Blyth Demonstration Site, Operations and Maintenance Geophysical Surveys
Bibby HydroMap were commissioned by Blyth Offshore Demonstrator Ltd/EDF Renewables, in August 2018, to undertake a geophysical survey at the Blyth Offshore Demonstrator wind farm, located off the north-east coast of the UK at Blyth, Northumberland. The 41.5 MW wind farm is located approximately 6km offshore of Blyth and comprises five wind turbine generators configured in a single row. The survey was undertaken between 30/08/2018 and 14/09/2018. This survey, comprising the collection of multibeam bathymetry and side scan sonar data, marks the first of a 3-year monitoring program, which will be undertaken at 6 monthly intervals, and after any major storm events. The objectives of the survey program are to acquire survey data to a resolution that will: - Identify seabed debris within the construction area; - Identify changes to seabed morphology, to enable the evaluation of the effectiveness of installed scour protection and ratify predictions for scour development; - Inform the foundation and cable maintenance schedule; and - Satisfy the requirements of the Marine Licence. Data acquisition was undertaken from Bibby HydroMap’s own dedicated shallow draft vessel MV Proteus, equipped with a Dual head Norbit WBMs multibeam, Klein 3000 side scan sonar, POS MV MRU and CNAV positioning system.
Series2018, Natural Power, Blyth Demonstration Site, Benthic Monitoring - Array 2
Annex 2 of the Marine Licence (L/2013/00303) specified that a post-construction monitoring programme including benthic ecology surveys must be undertaken, which must also include a survey for Annex 1 habitats. Post-construction surveys are required to assess any changes in the diversity and distribution of benthic ecology populations in and around the developed site and to provide monitoring of ecological effects of the development. In October 2017, the Post-Construction Benthic and Fish Survey Monitoring Plan (Document Number: BOD-101-04-NPC-MWL-00006-A-02) was agreed with the MMO. This document outlined the benthic and fish survey monitoring plan for post-construction surveys as per the Marine Licence. All surveys conducted were undertaken in line with the post-construction Benthic and Fish Survey Monitoring Plan. This purpose of the report in this series is to provide BODL with a comparison of the post-construction data with the EIA baseline and pre-construction characterisation of the benthic ecology present in and around the Blyth Offshore Demonstrator Project. The document presents the findings of the benthic grab, epibenthic beam trawl and drop- down video (DDV) surveys, which were undertaken by Natural Power Consultants Ltd. An intertidal survey was also undertaken and reported on separately, this report is provided in Annex A.
Series2018 - 2019, Natural Power Consultants, Blyth Demonstration Site, Fish and Shellfish Study
Blyth Offshore Demonstrator Ltd (BODL) has developed an offshore wind demonstration site off the Northumberland Coast close to the Port of Blyth. The report in this series has been produced in order to provide BODL with a post-construction comparison to baseline (EIA) and pre-construction characterisation of the fish and shellfish populations present in and around the Project. This report presents the findings of the otter trawl, set nets and potting surveys, which were undertaken by Natural Power Consultants Ltd.
Series2017, EGS, Blyth Demonstration Site, Detailed Geophysical Survey
EGS (International) Ltd carried out a survey for Blyth Offshore Demonstrator Ltd (BODL), offshore of Blyth, northeast England. The objectives of the geophysical survey were to acquire data over Array 2 dredge dump area and 250m radius on 5 WTG locations. Geophysical operations were undertaken using multibeam echosounder (MBES) and side scan sonar (SSS) equipment. The MBES survey was conducted onboard the EGS Watchful, operating out of the Port of Blyth. The vessel mobilised on 25th May 2017, with MBES operations completed by 28th May 2017. Due to a fault with the vessel’s port engine, SSS acquisition could not be carried out safely so a local vessel of opportunity (MTS Taktow) was utilised. The vessel was mobilised alongside Blyth on 30th May 2017, with acquisition completed on 31st May 2017.
Series2017, Wessex Archaeology, Blyth Demonstration Site, Inter-tidal Archaeological Watching Brief Method
Wessex Archaeology has been commissioned by Blyth Offshore Demonstrator Limited (BODL) to produce a Method Statement (MS) in support of archaeological mitigation required for the inter-tidal works that will be completed during the installation of the export cable for Array 2 of the Blyth Offshore Demonstrator Project. This Method Statement has been prepared by Wessex Archaeology on behalf of BODL in support of its objective to prevent significant impacts to archaeological receptors within the Archaeological Study Area (ASA) during the forthcoming installation of cables within the inter-tidal zone on Cambois Beach (anticipated to commence in 2017). The ASA is made up of the cable route corridor and the onshore works with a 50m buffer around them.
Series2017, Wessex Archaeology, Blyth Demonstration Site, Archaeological Review of UXO Survey
Wessex Archaeology has been commissioned by Blyth Offshore Demonstrator Limited (BODL) to undertake an archaeological assessment of the Unexploded Ordnance (UXO) Clearance and Disposal survey data attained for the Export Cable Route (ECR) and the Wind Turbine Array 2, undertaken in 2016 as part of the Blyth Offshore Demonstration Project. This document has been prepared to detail the results of that assessment. The archaeological assessment began with a review of the Target Investigation Reports prepared by the contractor commissioned to carry out the inspection and clearance (N-Sea). These included ‘as found’ co-ordinates for the targets, a brief description of the material, and video stills and sonar data. The assessment categorised targets based on archaeological interest, archaeological value and confidence of assessment. Where it was determined that further information was required to inform the archaeological assessment, the Remotely Operated Vehicle (ROV) video was requested for further assessment.
Series2017, Wessex Archaeology, Blyth Demonstration Site, Archaeological Assessment of Geophysical Data
Wessex Archaeology (WA) was commissioned by Blyth Offshore Demonstrator Ltd (BODL) to carry out an archaeological assessment of high-resolution geophysical survey data collected in 2016 over the Array 2 and Export Cable Route (ECR) of the proposed Blyth Offshore Demonstrator Project (BODP). This work follows on from the previous assessment of 2015 geophysical data over the development (Wessex Archaeology 2015) and the baseline set out in the existing scheme-wide WSI (v8, Wessex Archaeology 2017). This assessment consists of a review of sidescan sonar, magnetometer and multibeam bathymetry data acquired by Gardline Geosurvey Limited (Gardline) between May and July 2016 and nearshore survey data acquired by Titan Environmental Surveys Ltd. (Titan) in May 2016 over the Array 2 and ECR areas of the BODP.