2012-2013, E.ON, Humber Gateway, Ornithological Monitoring Plan (OMP)

2012-2013, E.ON, Humber Gateway, Ornithological Monitoring Plan (OMP)

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

January 2012 - January 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The Humber Gateway Project Marine Licence required pre-construction ornithological surveys to take place in the year preceding construction. The pre-construction OMP took place between January 2012 and January 2013 undertaken by Natural Power Consultants. 

Categories:
Birds
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
4