2005, EMU, Inner Dowsing - Lynn - Lincs, Mussel Survey
Summary
Data & downloads
Reports
Data Highlights
Related Pages
Series2015, EGS, Inner Dowsing - Lynn - Lincs, Turbine Clearance Survey
EGS (International) Ltd, on behalf of Centrica, undertook a Side-Scan Sonar (SSS) and Multibeam (MBES) clearance survey centered on the no cable zones (500m by 500m) around around WTGs LS28 (on the Lincs site) and WTGs ID16 and ID24 on the Inner Dowsing Site which is located in the southern North Sea, approximately 5km off the coast of Lincolnshire near Skegness. The areas surveyed were identified by Centrica for the upcoming works on the aforementioned turbines and respond to the need to have a jack-up vessel in the locality to complete the works. This report details the operations and results of the survey around all turbines. The work was to ensure the Jack-up vessel jacks up safely within the ‘No Cable Zone’ at each of the three turbines, a geophysical clearance was carried out over a 500m by 500m survey area centred on the No Cable Zone. The primary objectives of the survey were to: - Acquire bathymetric data with 100% coverage within the pre-defined survey area - Acquire side-scan sonar data with 100% coverage within the pre-defined survey area - Use the acquired side-scan sonar and bathymetric datasets to identify obstructions which could impede the arrival of the Jack-up vessel, specifically, existing Jack-up rig foot prints, significant objects and man-made features on the seafloor
Series2011-2014, HiDef, Inner Dowsing - Lynn - Lincs, Digital Aerial Bird Surveys
HiDef Aerial Surveying Limited (HiDef) was commissioned to undertake digital video aerial surveys as part of a programme to monitor the effects of the construction and operation of the Inner Dowsing, Lynn and Lincs Offshore Wind Farm projects on seabirds. The objectives were established in an Ornithological Monitoring Plan (OMP) (Centrica, 2013) to meet the requirements of Marine Licence L/2011/00111/9 (the Marine License) issued by the Marine Management Organisation (the Licensing Authority) for the Lincs project. The OMP was approved by the Licensing Authority on 8th April 2013, following consultation with the Statutory Nature Conservation Bodies (SNCB). Aerial surveys were flown using four super high definition video cameras mounted on the underside of the aircraft. Video images were processed in two stages, firstly detecting and marking objects then secondly these were identified to species or species group. A full QA process was used to ensure accuracy of detection and identification. Abundance of birds was estimated by computing density surface models from the survey data. Visualisations of raw count data and fitted distribution maps from density surface models were used to present distribution patterns of birds within the study area. This series contains reports and datasets collated from the surveys conducted between 2011 and 2014, covering the construction and post-construction phases of the project.
Series2010-2013, RPS, Inner Dowsing - Lynn - Lincs, Radar Monitoring of Pink-footed Geese Migration
RPS, in collaboration with the Food and Environment Research Agency (FERA), were commissioned by Centrica to investigate this migration using radar prior to offshore construction commencing in spring 2011. Lincs Wind Farm Ltd (LWFL) will commence installation of the Lincs/LID6 offshore wind farm, comprising 75 wind turbines offshore from Skegness during 2011. The Lincs/LID6 array will lie immediately to the east of the existing turbine arrays of Lynn and Inner Dowsing (LID) (Figure 1). The proposed turbines are Siemens SWT-3.6-120’s which have a 120 metre rotor diameter and a hub height of 85.25 metres above mean sea level. And a subset of the UK’s wintering pink-footed geese Anser brachyrhynchus pass through the area in the vicinity of the proposed development during their autumnal migration, en route to wintering sites in Norfolk. The aim of this study is to - • Characterise the nature of pink-footed goose flights over and in the vicinity of the proposed Lincs/LID6 turbine array and • To experimentally extend the range of the bird detection radar to cover the entirety of the Lincs/LID6 offshore wind farm while not compromising data collection over the LID arrays. This latter consideration was considered critical in order that inter-annual comparisons of flight behaviour over LID would remain valid.
Series2007, RPS, Inner Dowsing - Lynn - Lincs, Drill Arising Disposal Monitoring
Centrica Renewable Energy Ltd (CREL) was constructing an offshore wind farm and associated infrastructure at Lynn and Inner Dowsing approximately 5km from land off the coast of Skegness, Lincolnshire. As a number of proposed monopile locations required additional drilling during installation due to a hard underlying chalk formation, Centrica commissioned a field environmental survey to monitor the dispersion of drill arisings both in a near-field and far-field environment. The resulting study, carried out by RPS Energy, was based upon a suspended sediment survey, with fifteen sediment traps deployed at 100m, 1km and 5km distance from the drilled monopole locations. The survey was carried out in two phases, relating to the suspended materials recovered after 8 days, and the drilling of one monopile foundation (LN02), and a longer 30 day deployment following the combined effects of partially drilling 5 foundations. Survey operations included some preliminary seabed sampling and photography at and around some of the monopile locations prior to and immediately after drilling.
Series2004-2005, Department of Trade and Industry (DTI), Inner Dowsing - Lynn - Lincs, Aerial Survey of Waterbirds in Strategic Wind Farm Areas
The study was conducted collaboratively by organisations including the Department of Trade and Industry, Wildfowl & Wetlands Trust Consulting, Joint Nature Conservation Committee, and others, and was carried out between October 2004 and September 2005 to assess waterbird and seabird populations in the North West, Greater Wash, and Thames Offshore Wind Farm Strategic Areas. Employing systematic aerial surveys using GPS-equipped aircraft, distance sampling, and supporting field counts with advanced population modeling, the study documented the spatial and seasonal distribution, abundance, and behaviors of key species, such as Common Scooter and Red-throated Diver. Analysis revealed significant concentrations of waterbirds in regions like Liverpool Bay and identified critical habitats and data gaps, particularly for potential Special Protection Areas. The surveys provided vital baseline data for environmental impact assessments in wind farm planning, demonstrated the need for continued synchronized monitoring and central coordination to improve coverage and inform policy decisions, and recommended further assessment of unsurveyed areas and ongoing collaboration among stakeholders to ensure ecologically responsible offshore wind farm development.
Series2004 - 2005, EMU,Inner Dowsing - Lynn - Lincs, Fisheries & Epibenthos Surveys
This project includes surveys designed to obtain baseline information regarding diversity and abundance of fish and invertebrates (particularly commercial species) from the vicinity of the proposed Lynn, Inner Dowsing and Lincs offshore wind farm sites. As part of the monitoring programme stipulated within the FEPA Licences for construction of the consented Lynn wind farm (Licence No. 31792/04/2) and Inner Dowsing wind farm (Licence No. 31814/04/2) off the Lincolnshire Coast in the Greater Wash Strategic Area, Emu Ltd. was commissioned by Centrica Renewable Energy Limited (CREL) to undertake surveys of fish and shellfish species of commercial importance and of epibenthic communities. In addition, this report also presents data from the same survey types collected to contribute to the Environmental Baseline component of the Environmental Statement for the proposed Lincs offshore wind farm. Effectively all data collected for the two developments complement the other, as they are in such close proximity. The report presents the aims of the pre-construction/baseline survey, describes the sampling methodology employed and presents raw and analysed results. The Appendix describes the results of the study.
Series2004, Envision Mapping, Inner Dowsing - Lynn - Lincs, Sabellaria Spinulosa Survey
This project presents survey information to determine seabed conditions pre- and post-construction for three offshore wind farms off the Lincolnshire coast (Lincs, Lynn and Inner Dowsing). This report presents the survey results and analysis of the pre-construction phase. The purpose of the survey was to: • Identify the occurrence of Sabellaria spinulosa and, if present, describe the extent of development of reef communities likely to be of conservation importance; • Identify of other benthic habitats that might be sensitive to the construction and operation of wind farms; • Provide a baseline from which the effects of construction can be assessed, especially on any Sabellaria spinulosa; • Survey the seabed bathymetry.
Series2004, Envision Mapping, Inner Dowsing - Lynn - Lincs, Sabellaria spinulosa Benthic Survey
Envision Mapping Was contracted by Centrica to survey seabed in order to determine seabed conditions pre- and post-construction for three offshore wind farms off the Lincolnshire Coast. This series presents the survey and analysis of the pre-construction phase. Survey was to identify occurrence of Sabellaria spinulosa and other benthic habitats and also to provide a baseline from which the effect of the construction can be assessed as well as survey the seabed bathymetry.