Summary
Partrac Ltd. were contracted to deploy three Waverider wave buoys and two ADCP frames at the proposed Islay Offshore Wind Farm site. The objective of the study was to provide wave data that will informthe physical processes modelling and engineering design. The Waverider buoys were deployed on 12th February 2012 until the 14th August 2012, with th...