
2004, EMU, Kentish Flats, Debris Survey
Summary
In accordance with the FEPA licence, there is a requirement to undertake pre-construction and post-construction surveys of the Kentish Flats wind farm site to determine whether any debris has been left
on the seabed or significant changes to the seabed profile have occurred as a result of the construction
activity. EMU Limited was commissioned by NEG Micon UK Ltd. to perform hydrographic surveys of
the turbine locations and cable routes in order to determine this.
Data & downloads
Reports
