2007, EMU, Kentish Flats, Swath Survey

2007, EMU, Kentish Flats, Swath Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

August 2022

Collection date:

November 2007 - November 2007

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

August 2022

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

In accordance with the FEPA licence, there is a requirement to undertake pre-construction and postconstruction surveys of a selection of turbine locations and the associated cable corridors to determine rates of scour after construction. Emu Limited was commissioned by Kentish Flats Ltd. to carry out a series of hydrographic surveys spaced at 6 mon...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
1

Data Highlights


Explore the wealth of the data gathered in the 2007, EMU, Kentish Flats, Swath Survey


4

Kentish Flats Offshore Wind Farm: Post Construction Swath Survey, 2008