2010, Turner and Townsend, Blyth Demonstration Site, Cable Shore Landing Study

2010, Turner and Townsend, Blyth Demonstration Site, Cable Shore Landing Study

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

June 2026

Collection date:

July 2010 - August 2010

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

March 2025

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The National Renewable Energy Centre Limited (Narec) is in the process of developing an offshore wind farm test site in the North Sea near Blyth, Northumberland. It is currently proposed that the test site will consist of up to four pre-consented arrays which will provide a facility for wind turbine manufacturers and developers (tenants) to deploy ...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

2010, Turner and Townsend, Blyth NaREC Offshore Demonst...

Select a Package from the list on the left to see more information about it