Series2016-2017, Jon Ford Environmental Consultancy, Kentish Flats Extension, Ornithological Survey Annual Report
This report presents the results of the bird monitoring programme that has been undertaken between October 2016 and March 2017. It forms the second year of the post-construction phase monitoring of the Kentish Flats Offshore Wind Farm Extension. The purpose of this report is to document the surveys that have been undertaken during this period, including the survey routes covered, present estimates of the bird populations present, and discuss the main findings of the surveys including a comparison with the previous survey results and assessment of any influence of weather conditions and other relevant information that may have affected species abundance and behaviour. The main aim of this phase of the work is to determine the distribution and abundance of seabirds using the Kentish Flats Offshore Wind Farm Extension (KFE) site and its surrounds after construction of the wind farm, and compare this with the pre-construction baseline. Standard survey methodologies have been used, following Camphuysen et al. (2004) and have remained consistent throughout the surveying undertaken. The KFE is located in the Outer Thames Estuary, approximately 7 kilometres off the north Kent coast. KFE extends over an area of 7.8km2. The original Kentish Flats Offshore Wind Farm has been operational since 2005 and consists of 30 x 3MW wind turbines. Offshore construction of the KFE commenced in April 2015 with the installation of turbine foundations. Piling of the turbine foundations was completed on 23 May 2015. Turbine installation was completed on 10 August 2015, and all 15 turbines were generating power to the National Grid from 12 September 2015. The KFE development comprises 15 x 3.3MW wind turbines. Two export cables have been installed alongside the existing cables and come ashore near to Hampton Pier, Herne Bay. The onshore cable route follows the existing Kentish Flats cable route to the Red House Farm substation on Thornden Wood Road. The export cable is 18km, with 12km of inter-array cables connecting the turbines into strings. The cables were installed using a water jetting method with a final burial depth in the range of 0.5 to 2m below the seabed.
Series2015, Spectrum Geosurvey, Kentish Flats Extension, Geophysical Survey
Spectrum Geosurvey Limited was contracted by Vattenfall Wind Power Limited to perform a post construction survey on the Kentish Flats Extension offshore wind farm. The primary requirement was to acquire multibeam bathymetry and backscatter data along the Kentish Flats Extension export cables, inter-array cables and surrounding the fifteen wind turbine generators. Multibeam bathymetry and backscatter data were acquired on board the survey / crew transfer vessel “Spectrum 1” between the 5th – 11th November 2015. All survey specifications were met and a total of 159 seabed targets larger than 0.5m in any dimension were subsequently identified. All reporting for this survey is contained entirely within this document. The following conclusions were reached following the survey operations and subsequent analysis: 159 seabed features have been identified within the survey area. No cable exposures are evident along the export cables and inter array cables. The largest shoaling and deepening differences associated with cable installation works between the 2015 Q4 and 2014 Q2 data were +1.15m (mattressing over LAL HV4 & KFE export cable Y2) and -0.8 m (trenching north of HV1 on export cable X4) respectively. The largest shoaling and deepening differences associated with spud can footprints are found between the 2015 Q4 and 2014 Q2 data were +0.95m (KFE WTG 05) and -3.15 m (KFE WTG 05) respectively. No significant changes were observed over the LAL/KF1 rock berms.
Series2015, Wessex Archaeology, Kentish Flats Extension, UXO Finds Assessment
Wessex Archaeology (WA) was commissioned by Royal Haskoning DHV on behalf of Vattenfall Wind Power Ltd to carry out an assessment of finds made by Ramora UK during their search of inshore/beach areas for UXO targets as part of the proposed Kentish Flats Offshore Wind Farm Extension. The Kentish Flats Offshore Wind Farm Extension (KFE) is an extension to the existing Kentish Flats Offshore Wind Farm (OWF) situated off Herne Bay, Kent in the outer Thames Estuary. It will include the installation of 15 new turbines and monopole foundations to the south and west of the existing OWF. There will be 10-12km of inter-array cable and up to two new export cables each approximately 8.5km long and including cable crossings (WA 2014). The finds assessment consists of a review of information and images from the 47 targets found by Ramora UK and assessment of these finds for archaeological potential.
Series2015, Vattenfall, Kentish Flats Extension, Bathing Water Quality Report
The Kentish Flats Extension (KFE) Environmental Statement (ES) recognised that there is a slight risk associated with the re-suspension of sediments during cabling works which could lead to increases in bacterial concentrations of the water column resulting from release of sediment bacteria. This Bathing Water Quality Monitoring Report has been produced in order to discharge Licence Condition 13 (3) of Part 2 of Schedule 2 (Deemed Marine Licence under the Marine and Coastal Access Act 2009) of the Kentish Flats Extension Order 2013, which reads as follows: “In the event that the installation of the export cable(s) takes place between May and September, bathing water quality shall be monitored and reported to the Environment Agency in accordance with a written protocol agreed in advance of such works taking place. The protocol shall include procedures for setting the bathing water quality baseline, details of the appropriate standards and the steps to be taken in the event that, as a result of the export cable works, bathing water quality falls below the agreed standards”. The closest designated bathing water to the project is at Herne Bay Central (lat/long: 51.37, 1.12; easting/northing: 617150, 168280) which is just under 1.5km east of the landfall at Hampton Pier (see Figure 1). The bathing water here ranges between the ‘sufficient’ and ‘good’ categories over 2011 to 2014 bathing seasons (note that these classifications are projected).
Series2015, Ocean Science Consulting, Kentish Flats Extension, Underwater Noise Monitoring Report for Piling Operations
Underwater noise monitoring was undertaken before and during piling operations at the Kentish Flats Extension (KFE) Wind Farm, UK. Piling operations were performed by GeoSea and IHC Hydrohammer BV on behalf of Vattenfall Wind Power Ltd, between 2nd and 24th May 2015. Ocean Science Consulting (OSC) Ltd was contracted to supply specialist underwater noise monitoring services before and during piling of four monopiles1, which was carried out between 29th April and 12th May 2015. This report provides results of both ambient noise and piling noise measurements, and underwater noise monitoring results, as required by 13 (1)(b) of Part 2 of Schedule 2 (Deemed Marine Licence under the Marine and Coastal Access Act 2009) of the Kentish Flats Extension Order 2013 and the Marine Management Organization (MMO).
Series2015, OSC, Kentish Flats Extension, Underwater Noise Monitoring
Underwater noise monitoring was undertaken before and during piling operations at the Kentish Flats Extension (KFE) Wind Farm, UK. Piling operations were performed by GeoSea and IHC Hydrohammer BV on behalf of Vattenfall Wind Power Ltd, between 2nd and 24th May 2015. Ocean Science Consulting (OSC) Ltd was contracted to supply specialist underwater noise monitoring services before and during piling of four monopiles , which was carried out between 29th April and 12th May 2015. This report provides results of both ambient noise and piling noise measurements, and underwater noise monitoring results, as required by 13 (1)(b) of Part 2 of Schedule 2 (Deemed Marine Licence under the Marine and Coastal Access Act 2009) of the Kentish Flats Extension Order 2013 and the Marine Management Organization (MMO).
Series2015, Jon Ford Environmental Consulting, Kentish Flats Extension, Ornithology Reporting
Ornithology observational reporting for Kentish Flats Extension between January 2015 and March 2015.
Series2014, Vattenfall, Kentish Flats Extension, Oyster Survey
The results of the oyster sample contaminants testing for Escherichia coli and heavy metals at Vattenfall’s Kentish Flats Offshore Wind Farm Extension Project were received from Cefas Technology Ltd. This series contains a Confirmation Letter on the oyster flesh analysis results, chemical analysis letter and the pre-jetting and during-jetting E.coli results.
Series2014, Brown and May Marine, Kentish Flats Extension, Otter Beam and Bass Net Trawl Survey
In order to monitor the abundance and composition of fish and epibenthic species within the area, otter and beam and bass trawl surveys were undertaken within and adjacent to the proposed Kentish Flats Offshore Wind Farm Extension (KFE). The results from the pre-construction surveys will be compared to those undertaken when the KFE is operational. The sampling sites have been categorised into “control” and “wind farm” in agreement with the Marine Management Organisation (MMO). Due to the small area of the extension, the “wind farm” sampling locations cover the existing Kentish Flats wind farm, the proposed KFE zone and the export cable route as well as their immediate surroundings.
2014, Royal Haskoning DHV, Kentish Flats Extension, Intertidal Phase 1 Survey
A pre-construction Phase 1 intertidal survey was undertaken for the Kentish Flats Extension Offshore Wind Farm at the export cable landfall site, adjacent to Hampton Pier, Herne Bay. The objective of the survey was to provide a baseline for identifying any changes that may occur following construction of the landfall site, due to occur in July 2015. The survey was carried out on the 10th September 2014 during a spring low tide to allow as much of the intertidal area to be surveyed as possible. The survey was conducted for approximately 2 hours either side of low tide. Prior to the survey, maps were annotated with the assistance of previous biotope maps and aerial photographs. During the survey all biotopes were recorded and their spatial extent mapped using Ordnance Survey maps as a baseline. Any species encountered were recorded as target notes. The majority of the shore is sandy and is classed as LS.LSa.MuSa.MacAre (Macoma balthica and Arenicola marina in littoral muddy sand), with a barren shingle ridge present at the upper shore (LS.LCS.Sh.BarSh). The remains of the old Hampton Pier comprised of boulders covered with mussels and barnacles (LR.LHR.MusB.MytB). The distribution of these biotopes is similar to those recorded in the 2002 survey for the existing Kentish Flats export cable landfall area. An additional biotope of Barnacles and Littorina spp. on unstable eulittoral mixed substrata (LR.FLR.Eph.BLitX) was recorded during this survey, adjacent to the littoral rock, comprising of cobbles over sediment. The cobbles were covered with barnacles (Semibalanus balanoides) and occasional mussels (Mytilus edulis).
Series2014, Ocean Ecology, Kentish Flats Extension, Benthic Survey
OceanEcology Limited were commissioned by Vattenfall Wind Power Ltd to undertake a pre-construction benthic survey of the Kentish Flats Extension (KFE) area in order to provide a detailed baseline of the benthic habitats and associated macrobenthic assemblages. The survey was undertaken in June 2014 and involved single and triplicate grab sampling at 53 stations resulting in the collection of 119 sediment samples that were subject to faunal, PSD and TOC analysis. The resulting data underwent univariate and multivariate analysis to establish the nature of the sediments and associated macrobenthic communities distributed across the KFE area, the cable route corridor and tidal excursion.
Series2014 - 2015, Vattenfall, Kentish Flats Extension, Environmental Monitoring Report
This Pre-construction Environmental Monitoring Report has been produced in order to discharge Licence Condition 12 of Part 2 of Schedule 2 (Deemed Marine Licence under the Marine and Coastal Ac-cess Act 2009) of the Kentish Flats Extension Order 2013. The purpose of this document is to provide an overarching summary of all pre-construction survey reports produced on behalf of Vattenfall Wind Power Ltd for the Kentish Flats Extension (KFE) Offshore Wind Farm project. All technical reports are appended to this report which summarises the benthic and intertidal ecology, geophysical, fish and shellfish, ornithological and archaeological monitoring within the Order limits. A pre-construction benthic grab sampling campaign was undertaken to survey the abundance and distribution of benthic fauna and analyse sediments within the Order limits. The biological, physical and chemical components of the samples were analysed to provide a detailed baseline of the benthic habitats and associated macrobenthic assemblages. A pre-construction Phase 1 intertidal walkover survey was undertaken at the landfall site of the KFE cable route to collate baseline maps and data about the intertidal habitats present against which any future change may be measured post-construction. Pre-construction geophysical surveys were undertaken to determine and report on the seabed conditions in the KFE project area, including the export cable corridor, to provide a pre-construction baseline against which any impacts of the construction of the wind farm on the seabed can be assessed. A range of surveying tools were employed including multi-beam echo sounder, side scan sonar and side bottom profiling to provide bathymetric information, map seabed features and locate any anomalies of interest. Pre-construction fish and shellfish monitoring was undertaken using otter, beam and bass trawls, oysters were also collected for contaminants analysis. Data was collected to characterise the baseline abundance and distribution of key fish and shellfish populations within and adjacent to the KFE project. Where necessary, the baseline will be compared with post-construction fish and shellfish population da-ta and assess any changes associated with the construction of the KFE project. Monthly pre-construction boat based surveys are currently being undertaken within a 4km buffer zone of the KFE boundary to collect data about existing ornithological activity, the aim is to monitor impacts on sensitive species in the vicinity of the KFE project. As the surveys are currently on-going the pre-construction survey shall be submitted to the Regulators separately following survey completion. A review of all geophysical datasets from was undertaken to inform the Archaeological Geophysical Assessment. This details all known and predicted seabed and palaeogeographic features of potential archaeological interest and proposed mitigation measures for consideration in planning construction and development activities.