2018, Bibby HydroMap, Blyth Demonstration Site, Operations and Maintenance Geophysical Surveys

2018, Bibby HydroMap, Blyth Demonstration Site, Operations and Maintenance Geophysical Surveys

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

November 2021

Collection date:

August 2018 - September 2018

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

November 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Bibby HydroMap were commissioned by Blyth Offshore Demonstrator Ltd/EDF Renewables, in August 2018, to undertake a geophysical survey at the Blyth Offshore Demonstrator wind farm, located off the north-east coast of the UK at Blyth, Northumberland. The 41.5 MW wind farm is located approximately 6km offshore of Blyth and comprises five wind turbine ...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Datasets
4
Reports
3

Data Highlights


Explore the wealth of the data gathered in the 2018, Bibby HydroMap, Blyth Demonstration Site, Operations and Maintenance Geophysical Surveys


6

Operations and Maintenance Geophysical Survey at Blyth Demo Offshore Wind Farm