Summary
EMU Ltd was commissioned by Centrica Energy Ltd to undertake a preliminary geophysical survey over the Lincs wind farm site in the offshore area between Wash and Humber. The entire survey covered a total area of approximately 34.5 square kilometres. The survey was commissioned to meet two main objectives: 1) To identify the thickness of sediment un...