Summary
EMU Limited was commissioned by Lincs Wind Farm Limited to undertake an urgent survey for unexploded ordnance (UXO) at positions KP 2.0 to 15.0 of the two proposed Lincs export cable routes located in The Wash region. The survey comprised the collection of swath bathymetry, magnetometer and sidescan sonar data. The survey was carried out on a 12 ho...