2011, EMU, Lincs, Cable Route Unexploded Ordnance Survey

2011, EMU, Lincs, Cable Route Unexploded Ordnance Survey

Summary

EMU Limited was commissioned by Lincs Wind Farm Limited to undertake an urgent survey for unexploded ordnance (UXO) at positions KP 2.0 to 15.0 of the two proposed Lincs export cable routes located in The Wash region. The survey comprised the collection of swath bathymetry, magnetometer and sidescan sonar data. The survey was carried out on a 12 hour operational basis using the vessel EMU Surveyor between the 17th June and 28th June 2011. In order to achieve project objectives a GeoSwath interferometric multibeam system and 3 Geometrics G-882 magnetometers were used. Tidal data were acquired for bathymetry reduction through the collection of GPS height data on board the survey vessel. Nene Surveyor was used to survey between KP 2.0 to 1.1 between the 28th June and 1st July 2011 because EMU Surveyor was unable to work in these shallow waters. Additional survey work was carried out between 28th July and 30th July 2011 on Nab Cat II between KP 2.0 to 1.1.
Categories
Geophysical
Development
Lincs
Industry
Wind
Phase
Pre-construction
Organisation
EMU
Available in this series
5 Datasets, 3 Reports

Data & downloads

Datasets