2016, Natural Power Consultants Ltd., Blyth Demonstration Site, Risk Assessment and Method Statement (RAMS)

2016, Natural Power Consultants Ltd., Blyth Demonstration Site, Risk Assessment and Method Statement (RAMS)

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

January 2016 - January 2016

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Natural Power Consultants (Natural Power) has been invited by Blyth Offshore Demonstrator Limited (BODL) to
carry out pre-construction benthic monitoring surveys at the Blyth Offshore Demonstrator Project. Pre-construction
monitoring is required in order to comply with the Marine Licence conditions to establish an ecological baseline
prior to const...

Categories:
Benthic Ecology
Epifauna and Fish
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'