2014, DNV GL, Lincs Offshore Wind Farm, Cable Protection Assessment

2014, DNV GL, Lincs Offshore Wind Farm, Cable Protection Assessment

Summary

Lincs Wind Farm Limited has approached DNV GL to discuss potential cable remedial works in the Lincs offshore wind farm which are planned to be carried out in 2015. Lincs has been in commercial operation since September 2013, The main method of protection for the array and export cables was burial, but some cable sections did not achieve the targeted burial depth. The Customer would like to reassess the risks to the cables and the most suitable methods of additional protection, if any, and asked DNV GL to outline a methodology for this based on the published DNV pipeline standards and recommended practices. DNV GL extracted methodologies from DNV GL pipeline standards and recommended practices in order to develop a coherent approach which enables quantitative assessment of risks to specific cable sections.
Categories
Engineering DesignGeophysical
Development
Lincs
Industry
Wind
Phase
Post-construction
Organisation
DNV GL
License
Marine Data Exchange Terms of Use

Data & downloads

Reports