Summary
A series of pre-construction and post-construction surveys have been undertaken within and adjacent to the Lincs Offshore Wind Farm (OWF) in order to meet the requirements outlined within the Lincs Marine Licence L/2011/00111/9 and LID6 FEPA consent 34852/11/0. The first year post-construction (January to December 2014) otter and beam trawl surveys...