Summary
EGS (International) Ltd, on behalf of Centrica, undertook a Side-Scan Sonar (SSS) and Multibeam (MBES) clearance survey centered on the no cable zones (500m by 500m) around WTGs LS28 (on the Lincs site), and ID16 and ID24 (on the Inner Dowsing Site). The areas surveyed were identified by Centrica for the upcoming works on the aforementioned turbine...