2013, Anatec Ltd., Lincs Offshore Wind Farm, Updated Cable Anchoring Risk Assessment

2013, Anatec Ltd., Lincs Offshore Wind Farm, Updated Cable Anchoring Risk Assessment

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

July 2013 - July 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Anatec were commissioned by Centrica Renewable Energy Ltd to assess the risk of damage to their planned cable route in The Wash from vessels dragging anchor and from emergency anchoring. This report presents an update to the risk assessment, using 12 months of AIS data collected from September 2011 to August 2012.
This report summarises the data so...

Categories:
Shipping and Navigation
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1