Summary
Centrica commisionned ECON/ RPS to conduct thi pre-construction monitoring at the Lincs offshore wind farm site over a study area covering the site (plus a 1 km buffer) and adjacent control area of similar size and transect length. A total of 41 boat-based surveys were carried out from December 2007 until November 2010 inclusive. The main focus of ...